Download Print this page

Assembly Instruction - Echanfit CBK1901P User Manual

Magnetic exercise bike

Advertisement

ASSEMBLY INSTRUCTION:

1.PREPARATION:
A. Before assembling make sure that you will have enough space around the item.
B. Use the present tooling for assembling.
C. Before assembling please check whether all needed parts are available (at the above
of this instruction sheet you will find an explosion drawing with all single parts (marked
with numbers) which this item consists of.
2.ASSEMBLY INSTRUCTION:
:
FIG.1
FIG.2
FIG.1:
A) Attach the Front Stabilizer (pt.15) to the
Main Frame (pt.16) using two sets of Ø8
Flat Washers (pt.5), M8 Domed Nut (pt.6)
and M8*52 Carriage bolt (3).
B) Attach the Rear Stabilizer (pt.4) to the
Main Frame (pt.16) using two sets of Ø8
Flat Washers (pt.5), M8 Domed Nut (pt.6)
and M8*52 Carriage bolt (3).
C) The aluminium alloy kettle frame (19) and
the screw (84) are fixed on the main
frame (16) with a cross screwdriver.
FIG.2:
A) First, the elastic bolt (7) of the large
ball head is loosened and pulled
down, then the cushion adjusting pipe
assembly (10) is inserted into the
inner
liner
assembly (16) to make it in an
appropriate position, and then the
elastic bolt (7) of the large ball head
is loosened and locked.
B) At the same time, the buffer sliding
tube assembly (12) is inserted into
the buffer regulating tube assembly
(10) and the elastic bolt (7) of the
large ball head is locked by the buffer.
C) Finally, the buffer pad (13) is locked
with a tool (using a cross wrench).
7
of
the
main
frame

Advertisement

loading