BLIKIR RCP-2 G4 Installation Manual

Solar carport/canopy

Advertisement

Quick Links

Warning:
Please be advised that the installation manual for your carport is
subject to change without notice. As such, we strongly urge you to use the most
recent version of the manual before attempting to install your carport. This is
important to ensure that you have the latest and most accurate instructions to
guide you through the installation process. The latest version of the manual can
always be found on our website at the following link:
https://www.blikir.com/resources
Document Version: 08G4/2023/V02/ENG
Released on: August 1st, 2023
© BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc.
Date: 08G4/2023/V02/ENG. Subject to change without notice
RCP-2 G4 |
Solar Carport / Canopy
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RCP-2 G4 and is the answer not in the manual?

Questions and answers

Summary of Contents for BLIKIR RCP-2 G4

  • Page 1 Document Version: 08G4/2023/V02/ENG Released on: August 1st, 2023 © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 2: Table Of Contents

    2.5 Slide Connector Sleeves on Beams 2.6 Connect Middle Beams 2.6 Connect Beams at the center © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 3: Disclaimer

    Photovoltaic Modules and Panels. NOTE: Always check with the Authority Having Jurisdiction (AHJ) for additional requirements © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 4: Introduction

    2015 International Building Code 2018 International Building Code 2021 International Building Code ASCE 7-10 ASCE 7-16 © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 5: Maintenance

    By performing these routine inspections and tightening, you help ensure the continued stability and safety of your structure. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 6: Required Tools

    Qty 48 x #4 Rebar 30” ● Non-Shrink Grunt ● Qty 16 x Wire Mesh, 10 Gage min., 6” grid © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 7: Main Components

    J - Middle Connector K - Base Plate L - Escutcheon Plate (base plate cover) © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 8: Standard Dimensions

    RCP-2 G4 | Solar Carport / Canopy Standard Dimensions © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 9: Pier Location Diagram

    RCP-2 G4 | Solar Carport / Canopy © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 10: Components List

    HIT-HY 200 Adhesive ● Qty 16 x Wire Mesh, 10 Gage min., 6” grid ● Non-Shrink Grunt © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 11: Ironridge Racking Components

    2 X Safety Column Solar 2 X 3M VHB tape for safety lights LED Light (optional) © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 12: Build Base

    Before you dig any holes, contact all utilities in the area to locate any underground lines, pipes, and wiring. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 13: Reinforcing And Concrete

    If you choose to follow option B that is described in section 1.5 and install the base anchors lower than the surface, pour the concrete up to the desired height under the surface. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 14: Align Base Plates

    The use of gravel is necessary to facilitate proper water drainage. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 15: Build Structure

    Once the installation is complete, tighten all the bolts (2) to level the beams (12, 13) effectively. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 16: Connect Corners

    © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 17: Connect Beams To Corner Connectors

    Finally, tighten the set screws you installed on the corner sleeves in step 2.2 until the beams are appropriately leveled. SIDE VIEW: TOP VIEW: © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 18: Slide Connector Sleeves On Beams

    Finally, tighten the set screws you installed on the sleeves in step 2.2 until the beams are appropriately leveled. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 19: Connect Beams At The Center

    (3). Finally, tighten the set screws from step 2.2 until the beams are appropriately leveled. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 20: Connect Rails

    (3). Torque to 250 in-lbs (21 ft-lbs). Vertical side of L feet faces this way © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 21: Cut Rails To Match Panel Size

    You can cut the rails in step 3.2 in a way that avoids this situation, in case your panel dimensions result in such an occurrence. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 22: Connect Rails To L-Feet

    Feet. Level the rail at the desired height, and then tighten to a torque of 250 in-lbs. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 23: Connect Grounding Lug To Rail

    If you are using MLPE (microinverters, RSD or optimizers), you can install them at this step © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 24: Install Solar Panels

    Ensure CAMO bonding pins are fully seated on top of module frame. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 25: Connect First Column Of Panels

    • In case of re-installation requirements, it is recommended to use new jumpers. • It effectively supports bottom flange thicknesses ranging from 1.2mm to 3.1mm. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 26: Optional Add Ons

    Repeat these steps for the remaining two corners, ensuring a uniform and attractive appearance for your installation. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 27: Optional: Ev Chargers

    To continue with the installation process, please refer to the Enel X installation manual for detailed instructions and guidance. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...
  • Page 28: Optional: Columns Safety Solar Led Lights

    Please ensure to follow these instructions for optimal use and performance of the Column Safety Solar LED lights. © BLIKIR.Inc, All rights reserved. BLIKIR and the BLIKIR logo are trademarks or registered trademarks of BLIKIR, Inc. Date: 08G4/2023/V02/ENG. Subject to change without notice...

Table of Contents