Download Print this page

Baxi Assure FGHR Fitting Instructions Manual page 6

Advertisement

B1 & B2 identifying
labels
B1
To Combi Cold Water Inlet
Pipe B1 must be used on:
Baxi Assure Combi
Baxi 600 Combi
Baxi 800 Combi
Pipe B2 must be used on:
Baxi Assure 500-2 Combi
Baxi 600-2 Combi
Baxi 800-2 Combi
Table 1
6
A
C & D identifying
indentations
B2
Pipe Identification
4.0 Installation
4.1
1. It is essential that the pipes supplied are identified
correctly & joined and connected accordingly (Fig. 4):
• Pipe A - DHW Upper Pipe
• Pipe B1 - DHW Lower Pipe (see table 1 for boiler
• Pipe B2 - DHW Lower Pipe (see table 1 for boiler
C
• Pipe C - Mains In Upper Pipe
• Pipe D - Mains In Lower Pipe
2. Pipes A & C connect to the Assure FGHR unit.
Pipe B1 or B2 connects to the cold water inlet.
Pipe D connects to mains cold water.
3. Before soldering Pipe A to B1 or B2 and Pipe C to D
ensure that the nuts are fitted to A and C.
4. Note the identifying indentations in Pipes C & D - Pipe
A must not be connected to Pipe D. Pipes B1 & B2 are
identified by a label.
D
5. Ensure that the horizontal legs of Pipes A & B1 or B2 are
offset slightly as illustrated (when viewed from above)
before soldering (Fig. 5).
6. An offset of 3° ensures that Pipe B1 or B2 will connect
correctly to the cold inlet tap and allow Pipe A to clear
the boiler adaptor.
Mains Cold Water
Fig. 4
Pipes A & B1 or B2 offset
Installation - Pipe Assembly
applications)
applications)
Note: Pipe B2 is 13 mm longer than B1
B1 or
B2
Offset pipes by 3°
A
Fig. 5

Advertisement

loading