Maintenance Instructions; Replacing The Mains Cable - Pro Work PGP 3600 K Operating Instructions Manual

Garden pump
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Anl PGP 3600 K SPK1
06.09.2005
GB
Depending on the suction height and the amount
of air in the intake line, priming can take anywhere
between 30 seconds and 5 minutes. If it takes
longer than this, the pump should be refilled with
water.
If the pump is removed again after use, it must
always be refilled with water whenever it is
connected up and used again.

10. Maintenance instructions

The pump is basically maintenance free. To
ensure a long service life, however, we
recommend regular checks and care.
Warning!
Before every servicing, switch off the pump
and remove the plug from the socket.
If the pump is not going to be used for a long time
or has to be removed for the winter months, rinse
it out with water, empty it completely and allow it
to dry.
If there is a risk of frost, the pump must be
emptied completely.
After long stoppages, make sure the rotor turns
correctly by briefly switching the pump on and off.
If the pump becomes blocked, connect the
pressure line to the water line and remove the
intake hose. Open the water line. Switch on the
pump several times for approx. 2 seconds. Most
blockages can be removed in this way.

11. Replacing the mains cable

Warning! Disconnect the pump from the mains!
If the mains cable is defective, it must be
replaced by an electrician.
8
8:54 Uhr
Seite 8

Advertisement

Table of Contents
loading

This manual is also suitable for:

41.801.10

Table of Contents