Major Generator Features; Control Panel; Portability Kit Installation - Coleman Powermate PM0495503.01 Manual

Table of Contents

Advertisement

Available languages

Available languages

MAJOR GENERATOR FEATURES

*
Honda OHV engine
*
Cast-iron cylinder sleeve
*
Low oil sensor
*
Receptacles on control panel
*
6 gallon plastic fuel tank
*
Portability Kit

CONTROL PANEL

A. 120 V, 20 Ampere Duplex Receptacle
This duplex is split so that 20 amps of current may be
drawn from each half of the receptacle. However, total power
drawn must be kept within nameplate ratings. These
receptacles may be used along with the twistlock receptacle
provided the generator is not overloaded.
B. 120/240 V, 30 Ampere Twistlock Receptacle
A maximum of 30 amps may be drawn from the 120/240
volt receptacle, provided it is the only receptacle used.
However, current must be limited to the nameplate rating. If the
120/240 volt receptacle is used along with the 120 volt
receptacle, the total load drawn must not exceed the nameplate
ratings.
C. Circuit Breakers
The receptacles are protected by an AC circuit breaker. If
the generator is overloaded or an external short circuit occurs,
the circuit breaker will trip. If this occurs, disconnect all
electrical loads and try to determine the cause of the problem
before attempting to use the generator again. If overloading
causes the circuit breaker to trip, reduce the load. NOTE:
Continuous tripping of the circuit breaker may cause
damage to generator or equipment. The circuit breaker may
be reset by pushing the button of the breaker.
D. Engine On/Off Switch
2

PORTABILITY KIT INSTALLATION

TOOLS REQUIRED: 7/16", 1/2" and 9/16" sockets and
ratchets, block(s) of wood (minimum of 6" tall).
Refer to the parts list and drawing on pages 8 and 9.
WHEEL INSTALLATION
1. Block up end of generator opposite the fuel tank cap to
install wheel kit.
2. Insert wheel spacer (item 50) into the center of the wheel
(item 31).
3. Slide 3/8 x 4.25" bolt (item 35) and 3/8 washer (item 51)
through the wheel (item 31), then through the wheel
bracket on the carrier, with the offset side of the wheel hub
against the wheel bracket.
4. Thread 3/8 nyloc nut (item 36) onto the bolt and tighten to
securely clamp the wheel assembly to the carrier.
5. Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1. Assemble the rubber feet (item 32) to the foot bracket (item
49) using a 1/4-20 x 1.5" bolt (item 48). Thread a 1/4
washer (item 39) and a 1/4 nyloc nut (item 13) to the bolt to
secure the assembly. Caution: Do not over tighten so
that the foot material collapses.
2. Blocking up the alternator side of the generator, place the
foot bracket under the carrier channel. Thread a 5/16-18 x
1" bolt (item 47) with a 5/16 washer (item 34) through the
mounting holes and thread a 5/16 washer (item 34) and a
5/16 nyloc nut (item 16) to the bolt to secure the foot
bracket to the carrier.
LOCKING HANDLE
1. Attach the lanyards (item 33) to the release pins (item 37)
and carrier as shown in the illustration.
2. To lock the handle (item 28) in the extended position, align
the holes in the handle brackets with the holes in the carrier
brackets and insert the release pins (item 37).
3. Insert caps (item 38) into ends of handle (item 28).
1
2
English

Advertisement

Table of Contents
loading

Table of Contents