Guides - Sanyo SRT-4040 Basic Service Technical Information

Time lapse/real time video cassette recorder mechanism
Hide thumbs Also See for SRT-4040:
Table of Contents

Advertisement

3-14. GUIDES

3-14-1. GUIDE ROLLER ASSEMBLY
(See Fig.3-14-1)
1) Unscrew the two screws
careful not to damage the cylinder or the video head.
2) Remove the two guide roller assemblies
screwing them counterclockwise.
ASSEMBLY NOTES:
1. Tighten the two screws
After tightening, apply a screw-locking glue.
2. After replacing the parts, be sure to clean the guide
roller and carry out tape path adjustment as de-
scribed in section 4-3.
. When you do this, be
by un-
to a torque of 600 g/cm.
Fig.3-14-1
3-14-2.S AND T INCLINE MOUNTING
ASSEMBLIES (See Fig.3-14-2)
1) Refer to section 3-2 and remove the mechanism unit.
2) Refer to section 3-5-2 and remove the cylinder unit.
3) Refer to section 3-1 and rotate the loading motor in
the PLAY direction until tape loading is completed.
4) Shift the S incline mounting assembly
the direction of the arrow
S load lever assembly
5) Shift the T incline mounting assembly
the direction of the arrow
T load lever assembly
ASSEMBLY NOTES:
1. Apply grease (VHJ-0100) to the rail (top, underside
and sides) on the mechanism chassis.
2. When fitting the S and T incline mounting assem-
blies
and
manually in the EJECT direction. When tape unload-
ing begins, watch out in case the S and T incline
mounting assemblies
3. After replacing the parts, clean the cylinder and the
roller guide, then adjust the tape path as described in
section 4-3.
S incline mounting
assembly
S load lever
assembly
Apply grease to the
top, underside and
sides of the rail.
–22–
, then remove it from the
.
, then remove it from the
.
into the rail, turn the loading motor
and
get caught in the rail.
T load lever
assembly
slightly, in
slightly, in
T incline
m o u n t i n g
assembly
Fig.3-14-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp-rVp-n

Table of Contents