Download Print this page
ideal commercial EVOMOD 250 User Manual

ideal commercial EVOMOD 250 User Manual

Advertisement

Quick Links

USER GUIDE
EVOMOD
250 500 750 1000
For Installation Guide see reverse of book
When replacing any part on this appliance, use only spare parts that you can be
assured conform to the safety and performance specification that we require.
Do not use reconditioned or copy parts that have not been clearly authorised by Ideal.
For the very latest copy of literature for specification and maintenance practices visit our website
www.idealcommercialboilers.com where you can download the relevant information in PDF format.

Advertisement

loading

Summary of Contents for ideal commercial EVOMOD 250

  • Page 1 USER GUIDE EVOMOD 250 500 750 1000 For Installation Guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal.
  • Page 2: Important Notes

    Important Notes Natural Gas only PI No. 86CL 183 • This appliance must not be operated without the casing correctly fitted. Destination Countries: GB, IE • Do not store objects around or on the boiler, and keep access clear at all times. •...
  • Page 3 BOILER CONTROLS / DISPLAY (MASTER PANEL SHOWN) EVOMOD USER INTERFACE Mains On Ideal When the mains to the boiler is switched on a screen similar to the following will be displayed. Initialising Please Wait U/I PCB 330.E18 Pri’ PCB 332.E08 Off Mode Off Mode Off Mode...
  • Page 4 EVOMOD BASIC OPERATING INSTRUCTIONS SETTING FLOW TEMPERATURE Press SELECT and a screen similar to the following will be displayed The kW output number in the 1st line will vary depending on the maximum output of the boiler Ideal 750kW Normal Operation Set Flow Temp’...
  • Page 5: Frost Protection

    To shut Down the Boiler Condensate Drain 1. For short periods The condensate drain must not be modified or blocked. Set the external controls to OFF. Wait 2 minutes and then Blockage of the condensate drain, caused by debris or freezing, isolate the mains supply to the boiler.
  • Page 6 Ideal Boilers Limited pursues a policy of continuing improvement in the design and performance of its Ideal Consumer Helpline products. The right is therefore reserved to vary specification without notice. Tel: 01482 498376 Ideal is a trademark of Ideal Boilers. Registered Office; Ideal Boilers Limited National Avenue, Hull, HU5 4JB.

This manual is also suitable for:

Evomod 500Evomod 750Evomod 1000