On-site Inspection and Inspection Checklist

The on-site inspection is to perform inspection visually or using instruments for
each specification, standard, and installation status, and others based on the
inspection checklist actually at a site where the system is installed.
The inspector must record the results onto the inspection checklist during or after
filed inspection.

Sharing Inspection Results and Taking Corrective Actions

The inspector must share the inspection results (inspection checklist/corrective
actions) with an installation operator and, the installation operator must take the
corrective actions if necessary after reviewing the requirements.

Checking the Results of Corrective Actions

The inspector must check if the corrective actions are properly taken. If they are
not sufficient, the inspector must ask the installation operator to take the corrective
actions again
Sharing the Results of Corrective Actions and Preparing
Preventive Plan
After the corrective actions are all completed, the inspector must share the results
with the installation operator and relevant departments and prepare a preventive
plan to prevent the same or similar problems from re-occurring.

Construction Situation Checklist

Table 5. Construction Situation Checklist

Category
Check Items
Installing
Appearance of equipment
Equipment
and mechanical parts
Placement of equipment
and mechanical parts
Leveling condition of
equipment and
mechanical parts
Validity of status and
specifications of tightening
bolt/nut/washer, others.
Insulation status
5G Indoor CPE Installation Manual
Copyright © 2018, All Rights Reserved.
Criteria
Equipment damage such as Dent,
scratch and crack, and so on.
Maintenance and horizontal/vertical
placement
Horizontal/vertical status
Checking fasteners omission
Compliance with assembly order of
fasteners
Compliance with tightening torque
value
Checking electrical contact between
insulators (insulation resistance tester)
Confidential
Result
Pass
Fail
16