displayit E20A Assembly Instructions

20' ensemble tension fabric trade show display kit

Advertisement

79" x 91" Flat-Top
1
2
3
16
15
14
13
12
11
Foot push button holes
face backward
1. Straighten and assemble all
bungeed poles.
3. Pull pillowcase graphic over frame
and zip bottom closed.
20' Ensemble Tension Fabric Trade Show Display Kit E20A
1
4
16
5
15
6
14
7
13
8
12
10
9
79" x 101" Arch-Top
2
3
11
10
9
Foot push button holes
face forward
2. Assemble the frame by aligning
the stickers as seen in the frame
diagram above.
4. Attach the feet to the frame as
seen in the diagram above.
Assembly Instructions
79" x 91" Flat-Top
4
1
2
5
16
6
15
7
14
8
13
12
11
Foot push button holes
face backward
3
4
5
6
7
8
10
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E20A and is the answer not in the manual?

Questions and answers

Summary of Contents for displayit E20A

  • Page 1 20’ Ensemble Tension Fabric Trade Show Display Kit E20A Assembly Instructions 79” x 101” Arch-Top 79” x 91” Flat-Top 79” x 91” Flat-Top Foot push button holes Foot push button holes Foot push button holes face backward face forward face backward 1.
  • Page 2 Ensemble Shelving System with Monitor Mount Assembly Instructions Optional Monitor Mount Attaches Here 1. Matching the numbered stickers, 2. Using the provided 5mm allen wrench assemble the frame as seen in Diagram A. assemble the monitor and shelf supports. Top of Monitor Diagram A VESA 75 monitors on inner holes...

Table of Contents