Operation; Power On/Off; Operation And Display Panel - Flin Energy FlinFuzion 5kVA-48V User Manual

Solar hybrid inverter
Hide thumbs Also See for FlinFuzion 5kVA-48V:
Table of Contents

Advertisement

OPERATION

Power ON/OFF

Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch
(located on the button of the case) to turn on the unit.

Operation and Display Panel

The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes
three indicators, four function keys and a LCD display, indicating the operating status and input/output
power information.
LED Indicator
LED Indicator
Function Keys
Function Key
ESC
UP
DOWN
ENTER
Side view of unit
Solid On
Green
Flashing
Solid On
Green
Flashing
Solid On
Red
Flashing
Description
To exit setting mode
To go to previous selection
To go to next selection
To confirm the selection in setting mode or enter setting mode
LCD display
LED indicators
Function keys
Messages
Output is powered by utility in Line mode.
Output is powered by battery or PV in battery mode.
Battery is fully charged.
Battery is charging.
Fault occurs in the inverter.
Warning condition occurs in the inverter.
10
FlinFuzion Solar Hybrid Inverter