Clam C-890 Service Information page 3

Thermal hub shelter
Table of Contents

Advertisement

2. It is advised to have at least two people to set
up a Clam Six Pack shelter.
Open the shelter so that one wall is facing upward.
Make sure that the tent is not twisted or
overlapping any of the poles (Photo 2). Do NOT
force the shelter while unfolding.
3. Grasp the loop onto the eyelet in the center of one
of the wall panels. Pull upward and outward on the
loop until the wall section pops up (Photo 3).
4. W alk around the entire shelter and pull each loop
sewn onto the eyelet in the center of the wall until all
sides are popped out (Photo 4).
5. Have a person hold down the shelter while a
second person goes inside the shelter and pushes
the ceiling hub straight up so the ceiling pops up
(Photo 5).
Page 3
SET-UP INSTRUCTIONS
Photo 3
Photo 2
Photo 4
Photo 5
Photo 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C-890 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

14478

Table of Contents