8.7 GAP Spec.
Gap between panel with bezel is 0 mm < gap < 1.5 mm
9. Power Line Transient Test (IEC 61000-4-4 Fast Transients/Burst)
TEST CONDITIONS & PROCEDURE: (Follow IEC 61000-4-4)
Test Condition :
The condition is based on operating with 50Ω load.
CM999
39