LUNA2000-100KTL-M1 Smart Power Control System
User Manual
Figure 8-20 Energy yield calibration
Step 6 (Optional) If a third-party NMS that complies with the IEC 104 protocol is
connected, choose Settings > IEC104, and ensure that the teleindication,
telemetering, telecontrol, and teleadjust signal numbers of the new Smart PCS on
all tab pages under IEC104 are the same as those of the faulty Smart PCS.
Step 7 Click Deployment Wizard and then click Search for Device to check cable
connections and allocate addresses.
Figure 8-21 Searching for devices
Issue 07 (2023-07-15)
Copyright © Huawei Technologies Co., Ltd.
8 Device Maintenance
69