Summary of Contents for J.Burrows ASHTON JBASH2DCAB
Page 1
ASSEMBLY INSTRUCTIONS ASHTON 2 DRAWER LATERAL FILING CABINET JBASH2DCAB This design and instruction booklet is subject to copyright. www.officeworks.com.au 1CTN...
Page 2
Tools Required For Assembly Recommend 2 Adults to Assemble Assemble Item On a Clean Flat Surface WARNING Please check you have all hardware before assembling. If you think you are missing any hardware please contact the store of purchase. Please ensure you have the name of the item and hardware part required and quantity. Please retain your receipt for proof of purchase to validate warranty.
Page 5
Step 3 If you need to remove the drawer, please pull the drawer all the way out, then simultaneously push the plastic release lever of the ball bearing slides up on one side and down on the other side, and then pull the drawer completely out.
Page 6
Step 4 To place the drawer back, simply push the ball bearing cart all the way to the end of the slides (in both sides), and align the slide runners on the drawer with the slide tracks on the unit. Push it carefully inside until it stops.
Need help?
Do you have a question about the ASHTON JBASH2DCAB and is the answer not in the manual?
Questions and answers