Connecting For Operation Without An Spe Blocking Element - Bosch SE 120 LSNi Installation Manual

Smartkey arming device
Table of Contents

Advertisement

Connecting for Operation Without an SPE Blocking Element

Use the following switching arrangement on the control unit to set the operating mode without
SPE blocking element. Connect the inputs HALL1 and HALL2 to 0V.
1 +U
2 0V
3 aLSN1
4 bLSN1
5 +U
6 0V
7 aLSN2
8 bLSN2
9 Ground
17 Test
18
21 Free
22 Free
57 56
A
Free Free
0
0
CL
1
1
9
2
2
8
3
7
6
4
5
DK
BR1
B1 Operation
B2 Programming
B3 Bolt Test
23 24
R
EG 12K1 already installed
E
Points 21/22 and 23/24 are connected internally.
9
Installation Instructions
55 54
PL2 53
B
Free Free
C
0V 52
D
PL1 51
0
1
9
0V 50
2
8
3
7
Free 49
6
4
5
Free 48
EW1a 47
R
EG
EW1b 46
E
VÜ 45
0V 44
Ground 43
+12V SPE 42
0V 41
HALL1 40
HALL2 39
MOT1 38
MOT2 37
ANT1 36
ANT2 35
+12V 34
SU 33
LED
LED1 32
LED2 31

Advertisement

Table of Contents
loading

Table of Contents