ASBER AESB-36 Instruction Manual

Salamander and cheese melter
Hide thumbs Also See for AESB-36:

Advertisement

Quick Links

SALAMANDER AND CHEESE MELTER
Manual Instructions
AESB-24, AESB-36, AECM-24, AECM-36
Manual instructions
EN
Installation and Operation
Manual de instrucciones
ES
Uso y mantenimiento
Bedienungshinweise
DE
Installation und Betrieb
Ręczny
PL
Obsługa i konserwacja
Manueltalimatları
TK
Kurulum ve Çalıştırma
Manuel d'instructions
FR
Installation et fonctionnement
Manual do instruções
PT
Instalação e Operação

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AESB-36 and is the answer not in the manual?

Questions and answers

John Richard Petrick
April 2, 2025

where is gas line connection for this unit asber AECM-36.....

3 comments:
Mr. Anderson
April 2, 2025

The gas line connection on the ASBER AESB-36 unit uses a ¾” NPT inlet.

This answer is automatically generated

John R Petrick
April 3, 2025

Where is gas line connection ? top , bottom,right, left , back ? there is nothing shown on your manual ....

John R Petrick
April 3, 2025

@Mr. Anderson ...gas line connection???? right, left, top , bottom , rear ? there is no diagram in your manual showing where it is ...Thank you

Subscribe to Our Youtube Channel

Summary of Contents for ASBER AESB-36

  • Page 1 SALAMANDER AND CHEESE MELTER Manual Instructions AESB-24, AESB-36, AECM-24, AECM-36 Manual instructions Manueltalimatları Installation and Operation Kurulum ve Çalıştırma Manual de instrucciones Manuel d’instructions Uso y mantenimiento Installation et fonctionnement Bedienungshinweise Manual do instruções Installation und Betrieb Instalação e Operação Ręczny...
  • Page 2: Table Of Contents

    asberprofessional.com INDEX ENGLISH MACHINE INTRODUCTION ..........................1 INTRODUCTION TO MACHINE& MODELS ................... 1 IMPORTANT SAFETY INFORMATION ....................1 SPECIFICATION CHART ........................1 INSTALLATION ..............................2 Transport, handling, unpacking, location ................... 2 Manufacturer’s identification label description ................. 2 Installation and assembly ........................3 2.3.1 UNCRATING ..........................
  • Page 3: Machine Introduction

    MACHINE INTRODUCTION 1.1 INTRODUCTION TO MACHINE& MODELS All equipment manufactured by ASBER is for use with the type of gas specified on the rating plate and for installation will be in accordance with National Fuel Gas Code ANSI Z223.1 (latest edition) Instruction to be followed in the event the user smells gas shall be posted in a prominent location.
  • Page 4: Installation

    2.4 Gas Connections 2.1 Transport, handling, unpacking, location Upon receiving your new ASBER Equipment, check the package and the machine for any damages that may have occurred during transportation. Visually inspect the exterior of the package. If damaged, open and inspect the contents with the carrier. Any damage should be noted and reported on the delivering carrier’s receipt.
  • Page 5: Installation And Assembly

    asberprofessional.com 2.3 Installation and assembly SHIPPING DAMAGE CLAIM PROCEDURE The equipment is inspected and crated by skilled personnel before leaving our factory. The transportation company assumes full responsibility for safe delivery upon acceptance of this equipment. If shipment arrives damaged: Visible loss or damage: Note on freight bill or express delivery and signed by person making delivery.
  • Page 6 asberprofessional.com INTALLATION ISOMETRIC VIEW asberprofessional.com...
  • Page 7: Gas Connections

    2.4.2 PRESSURE REGULATOR Commercial cooking equipment must have a pressure regulator on the incoming service line for safe and efficient operation; the gas pressure regulator supplied by ASBER must be installed at the gas inlet of each piece of equipment.
  • Page 8: Pressure Regulator Conversion

    asberprofessional.com PRESSURE REGULATOR CONVERS A. Remove cap and snap out plastic plunger from bottom of cap. B. Turn plunger over and snap back in original location. C. Re-insert the cap assembly into the regulator and tighten. Failure to install the pressure regulator will void the appliance warranty The fryer needs to be restrained to prevent tipping when installed in order to avoid the splashing of hot liquid.
  • Page 9: Operation

    asberprofessional.com OPERATION 3.1 General information. 3.2 Lighting Instructions. 3.3Daily Shut-Down. 3.1 General information. Operation of this equipment must be performed by qualified or authorized personnel who have read and are familiar with the functions of the equipment. WARINING Hot oil and hot surfaces can cause severe burns. Use caution when operating the fryer. Do not attempt to move the fryer filled whit hot oil or shortening.
  • Page 10: Maintenance

    asberprofessional.com MAINTENANCE 4.1 Cleaning 4.1 CLEANING For continued performance efficiency and longevity of your Fryer it is essential to carry out a good maintenance program. 4.1.1 DAILY OPEN BURNERS / HOT PLATES 1. Remove all top grates. 2. Lift off the burners heads and venturies by raising the head slightly, sliding to the rear and lifting upwards.
  • Page 11: Trouble Shooting

    asberprofessional.com TROUBLE SHOOTING PROBLEM PROBABLE CAUSE REMEDY Pilot will not a. No gas a. Turn main gas valve “ON” light b. Gas tap dial not set at “Pilot” b. Set dial position and depressed. combination gas valve to “Pilot”. Depress and hold while lighting.
  • Page 12: Warranty

    ASBER shall not be liable whether in contract or in tort or under any other legal theory for loss of revenue or profit, or for any substitute use or performance or for incidental, indirect, special or consequential damages, or for any other loss or cost of similar type.
  • Page 13 ASBER Circuito Exportación N° 201 Parque Industrial Tres Naciones San Luís Potosí, S.L.P. México 13105 NW 47th Ave Miami, Fl. 33054 www.asberprofessional.com MULTI-SOLUTION MANUFACTURER OF FOODSERVICE EQUIPMENT...

This manual is also suitable for:

Aesb-24Aecm-24Aecm-36Aesb-36-lpAesb-24-lp

Table of Contents