Installing Speed Control Rod; Setting Up Hydro Linkage - Toro 30335 Operator's Manual

Mid–size mower, proline hydro 15 hp with 36 in. side discharge mower
Table of Contents

Advertisement

1
3
4
5
7
Figure 4
1. Left handle shown
2. Neutral lock
3. Clevis pin
4. Drive lever
4. Thread rod fittings equal distance onto each control
rod. For a starting point, thread rod fittings onto
control rod approximately 2–1/2 in. (63.5 mm) from
the bottom (Fig. 5).
5. Install rod fittings to idler brackets with clevis pins and
e–ring (Fig. 5).
2
4
3
5
Figure 5
1. Control rod
2. Idler bracket
3. Rod fitting

Installing Speed Control Rod

1. Place the speed control lever full forward (Fig. 5).
6
2
m–5400
5. Control rod
6. Operator Presence
Control lever (OPC)
7. Hairpin cotter
1
m–5400
4. E–ring
5. 2–1/2 in. (63.5 mm) from
bottom
16
2. Thread yoke onto speed control rod approximately
3/4 in. (19 mm) (Fig. 5).
3. Install yoke to the speed control crank with a clevis
pin, washer and hairpin cotter (Fig. 5).
4. Secure yoke with jam nut (Fig. 5).
4
2
6
5
Figure 6
1. Speed control rod
2. Yoke
3. Jam nut
4. Speed control crank

Setting Up Hydro Linkage

Perform the following adjustments when the machine is
first set up and when any adjustment is needed. Do them
in the order that they are listed here.
Adjusting Speed Control Linkage
Refer to Adjusting Speed Control Linkages on page 33.
Adjusting Neutral Control Linkages
Refer to Adjusting Neutral Control Linkages on page 34.
Adjusting Hydro Control Linkages
Refer to Adjusting Hydro Control Linkages on page 35.
Adjusting Control Rods
Refer to Adjusting Control Rods on page 37.
1
3
7
m–5402
5. Hair pin cotter
6. Washer
7. Clevis pin

Advertisement

Table of Contents
loading

Table of Contents