Bed Set Up - Sunbeam IMCNT-D User Manual

Connected heated bedding
Table of Contents

Advertisement

Available languages

Available languages

Heated Bedding Set Up
1. Place the heating bedding on the bed with the label at the foot of the bed facing upward.
2. On Q/K Bedding, there is 2 zones allowing independent control of Side A & Side B. Side B is indicated
by the location of the label.
3. Connect the cord into the module at the bottom of the heated blanket mattress pad until the plastic
hinges click into place.
CAUTION: Cord must be COMPLETELY CONNECTED. A risk of fire could result from a loose connection.
4. Run the controller cord on the floor under the bed. Do not sandwich cord between the mattress and
box spring. Avoid any tangling or pinching.
5. Plug power cord into a 110-120 volt wall outlet.
CAUTION: Do not use with generator power or inverter.
6. The controller can be placed on either side of the bed.
On Q/K Bedding, there is 2 zones
allowing independent control of
Side A & Side B
STEP 1 Place on bed with
label at foot of bed
facing out
Connect the
STEP 2
Controller Cord
Connector and
module securely
See Controller Features on Page 6
for your individual control.
For questions or support, please visit www.sunbeamhome.com

Bed Set Up

SIDE A
If there is a flashing light or your wired controller
displays a flashing F1 or F2, see page 15.
STEP 4
SIDE B
STEP 3 Run Controller
Cord under the bed
Plug Power
Cord
into wall
STEP 5
The controller
can be placed
on either side
of the bed
E5

Advertisement

Table of Contents
loading

Table of Contents