BDS Maschinen MAB 1300 Operating Instructions Manual page 51

Hide thumbs Also See for MAB 1300:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 35
Weldon industrial tool holder
MAB 1300
NOTE
When using tools with Weldon shank, the tool holder with
retainer must be assembled (delivery condition).
For further information, see the section Dismantling/as-
sembling the tool holder.
Inserting the tool
Before inserting, clean the Weldon shank of the tool and the
tool holder.
Loosen both Allen screws in the tool holder with the Allen key
(H) supplied.
Insert the tool into the tool holder.
NOTE
Use the ZAP 200 (A) reducing ring for tools with 19mm
Weldon shank.
Insert the appropriate ejector pin (B,C,D,E) before inserting
a core drill.
Tighten both Allen screws in the tool holder using the Allen
key (H) supplied.
Removing the tool
Loosen both Allen screws in the tool holder using the Allen
key (H) supplied and remove the tool by pulling it down-
wards.
Remove the ZAP 200 reducing ring (A), if necessary.
Preparation
51

Advertisement

Table of Contents
loading

Table of Contents