Mitsubishi Electric CITY MULTI PVFY-P18 NAMU-E Installation Manual page 14

Hide thumbs Also See for CITY MULTI PVFY-P18 NAMU-E:
Table of Contents

Advertisement

Available languages

Available languages

DETAIL A
METAL TAB
BEND AROUND
THE WIRE
HARNESS
DETAIL A
Step. 4b Cut the plastic ties that are securing the extra wiring
for the LEV (CN60) and Thermistor (CN44). Route the LEV and
thermistor wires into the Electrical section of the air handler on the
left side of the coil.
-Use the metal tab in Detail A to secure the wires
-The notch in the drain pan allows the wires to pass the drain pan,
go through the sheetmetal shelf which now supports the Coil
Assembly and enter the Electrical section of the Air Handler.
Reconnect the LEV (CN60) and Thermistor (CN44) to the control
board.
14
DRIP LOOP
INSIDE DRAIN PAN
Step. 4c In order to prevent water from running down the LEV
and Thermistor wires into the electrical area, a Drip Loop MUST
be installed to direct water into the drain pan.
3rd
1st
2nd
Step. 5 Reinstall the panels over the drains and refrigerant lines.
Next, install the panels which cover the Coil (1
Blower (3
) and Filter (4
). NOTE: The panel which covers the Coil
rd
th
Assembly will be installed upright as the original vertical orientation
from the factory, while the other panels' text will read upside down.
TO ELECTRICAL
SECTION
4th
PRIMARY DRAIN
3/4" FPT
), Electrical (2
),
st
nd

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents