PREPARATION FOR OPERATION
( 8 ) C onnect by urethane tube between the upper part elbow unions ⑪ installed on the air cylinder
assembly and port A of the solenoid valve assembly ⑬.
Similarly, connect the urethane tube between lower side of elbow unions ⑫ and port B of the
solenoid valve assembly.
( 9 ) C onnect the air supply source to the IN port of the filter regulator ①.
(10) Tie together urethane tubes and cords with attached binding bands.
Note: Set the standard air pressure of the regulator to 0.4 MPa (4 kgf/cm
Air cylinder assembly
⑥
Urethane tube
⑤
⑨
Knee switch
LF-FM-CFT
(Option)
⑪
⑫
⑩
F ・ L
OPTION A
②
③
④ B port
⑧
OPTION B
S.M
— 2 —
2
).
⑬ B port
①
⑬ A port
④ A port
⑦ A port
IN port to the air
supply source