2.5 Operation

Do not overload the compressor: do not
exceed the max. number of switching cy-
cles and the ratio of operating time to
standstill!
Prevent the vessel from emptying completely
during longer downtimes***:
Close ball valve (item 22).
2.5.1
Insert
1. Connect the compressor to the mains
power supply.
2. Switch on the compressor at the ON/OFF
switch (item 10) or the main switch.
Compressor starts up and switches off
2.6 Maintenance
Interval / No later than Tasks
-- / As needed
-- / after each use
daily / commissioning
Once after 10 h / --
-- / Weekly
50 h / After 6 months
500 h / after 1 year
1,000 h / after 2 years
2,500 h / After 5 years
2.6.1
Before each maintenance task
1. Switch off compressor at the ON/OFF
switch (item 10) (if available). Discon-
nect power supply at main switch.
2. Depressurise the whole compressor:
slowly open the ball valve condensate
drainage (item 09) and close it if no more
air escapes.
3. For all maintenance tasks with the ex-
ception of chapter 2.6.3, 2.6.4, 2.6.10
and 2.6.11, open the panel on the sound
absorbing cover by removing the four
screws (figure 8a). Attach the panel
again on completing maintenance: com-
pressor should never be operated with
the panel removed!
When the switch-on pressure is reached, the
compressor restarts automatically.
2.5.2
Install the elastic connecting hose between
the ball valve (item 22) and compressed air
pipe system or compressed air cold dryer.
2.5.3
1. Switch on the compressor at the ON/OFF
2. Interrupt the power supply to the main
Clean compressor
Drain condensate from pressure vessel
Check the oil level, add oil if necessary.
Check screw connections
Check intake filter
Check V-belt tension (where applicable)
Clean intake filter
Change oil (1st oil change mineral or synthetic oil) 2.6.5
Change oil (with mineral oil)
Change intake filter
Change check valve and insert
Check screw connections
Change oil (with synthetic oil)
Change V-belts (where applicable)
Change safety valve
2.6.2
• Clean the cooling fins on the cylinder, cyl-
• Clean the fan impeller cover on the motor.
2.6.3
1. Place a suitable vessel under the conden-
2. To drain condensate, the pressure must
3. Open the ball valve (item. 09) and close
automatically: the compressor is ready
for use.
Compressed air bleeding
After use
switch (item 10).
switch.
Cleaning the compressor
inder head and aftercooler using com-
pressed air.
Draining condensate from pres-
sure vessel
Condensate is a water pollutant. Dispose
of it according to applicable regulations!
sate drain.
be approx. 2 bar.
it if no more condensate runs out
GB
UNM STS/STL XS
See chap.
2.6.2
2.6.3
2.6.4
2.6.6
2.6.7
2.6.9
2.6.7
2.6.5
2.6.7
2.6.10
2.6.6
2.6.5
2.6.9
2.6.11
II/3