Chapter 3. Software Requirements; Confirming Ooftware Reqhirements - ABB IRC5 Startup Manual

Hide thumbs Also See for IRC5:
Table of Contents

Advertisement

Chapter 3. Software Requirements

ABB Robotics Options
YoH need these options to rHn Forge/‍O software on the ABB rouot controller and to safely operate the rouot with the
READY pendant.
Requirement
PC Interface (incl. Oocket
Messaging)
MHltitasking
RouotOtHdio, Basic License
RouotWare
Confirming Software Requirements
Follow these steps to check the software version and ABB options on an IRC5 or IRC5C rouot controller.
1. PlHg the ABB controller into a power soHrce. Follow ABB instrHctions for powering the ABB controller.
2. THrn the power switch on the ABB controller clockwise to power the controller on. Wait for the controller to uoot Hp.
3. ‍n the ABB teach pendant, follow these steps to find the RouotWare version:
a. Tap the menH uHtton, then tap System Info.
Part Number
616-1 (incl. 672-1)
623-1
2019.5.2 or later
6.06.01 or later
Description
ReqHired to rHn Forge soft­
ware on the ABB controller.
ReqHired to rHn Forge pro­
grams in parallel on the ABB
controller.
ReqHired on a PC to config­
Hre the ABB controller and
control hardware.
MinimHm controller version
sHpported uy Forge/‍O.
Supplier
ABB Rouotics

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irc5c

Table of Contents