Hunter Burton Installation Manual page 10

Table of Contents

Advertisement

1886
1
Turning off the power
Ensure the power is OFF at the outlet box
and wall switch location before proceeding
with installation.
2
Preparing the Wall Switch
After removing the switch plate cover,
remove all wiring from the switch.
3
Wiring the Wall Control
Using the wire connectors, connect each
black wire from the wall control to a
black wire from the switch box. Connect
the green with yellow stripe wire to the
grounding wire from the switch box.
Note: If two white wires are present in the
switch box, connect them to each other if
they are not already connected.
4
Installing the Wall Control
Insert the wall control into the outlet
box and secure the two metal tabs to
the tabs on the switch box using the
two flat head screws that came with the
switch box.
5
Installing the Wall Plate
Mount the faceplate (not included) to
the wall control using the two #6-32
screws (not included).
6
Turning
on the
power
9
Ceiling Bracket
Installing Wall Control
1.
1.
1.
ON
ON
Downrod
WARNING
To avoid possible electrical shock, before
installing your fan, disconnect the power by
turning off the circuit breakers to the outlet
box associated with the wall switch location.
OFF
OFF
2.
2.
2.
Hanging Fan
Wiring
Blades
Wall Control

Advertisement

Table of Contents
loading

This manual is also suitable for:

5224752264

Table of Contents