Ruby ZEUS 7000 Instruction Manual page 87

Air conditioning + heater
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 74
OPERATION INTRODUCTION
Before starting operations in this section:
1. Find a place where there is power supply nearby.
2. As shown in Fig.2 and Fig.2a, install the exhaust hose, and adjust the window position well.
Fig. 2
Fig. 2.a
3. As shown in Fig. 2b, connect drain hose well (only for using heating model);
4. Insert the power cord into an grounded AC220~240V/50Hz socket;
5. Press the POWER button to turn on the air-conditioner.
Fig. 2.b
88

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZEUS 7000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Zeus 9000

Table of Contents