3.
Evaporator
Procedure
1) Remove 9 screws of the water collector
and remove the water collector
(see Figure 9).
2) Remove the screws of the pipe clamp
board and the left side board (3 for
the pipe clamp and 9 for left side
board) (see Figure 10).
Note: Remove the front panel (refer to 1. Front panel) before disassembling electrical parts.
Page 6
Illustration
Figure 9
Figure 10