Transport And Storage; Transport Markings; Checking The Delivery; Attaching The Rotor Shipping Brace Prior To Storage - Siemens SIMOTICS DC 1GH6 Operating Instructions Manual

Table of Contents

Advertisement

4.7

Transport and storage

4.7.1

Transport markings

The packing differs depending on the transport type and size. If not otherwise contractually
agreed, the packaging corresponds to the packing guidelines for International Standards for
Phytosanitary Measures (ISPM).
Comply with the images shown on the packaging. Their meaning is as follows:
This
way up
4.7.2

Checking the delivery

The components are assembled on an individual basis. When you take receipt of the delivery,
please check immediately whether the scope of the delivery matches up with the
accompanying documents. No claims relating to defects/items missing from the delivery will
be accepted if they are submitted at a later date.
● Report any apparent transport damage to the delivery agent immediately.
● Immediately report any apparent defects/missing components to your contact partner.
These Operating Instructions are part of the scope of delivery; keep them in a location where
they can be easily accessed.
4.7.3

Attaching the rotor shipping brace prior to storage

NOTICE
Bearing damage caused by vibration
If storage conditions are inappropriate there is a risk of bearing seizure damage. This can
result in material damage, such as damage to bearings caused by vibration.
● On machines that have been supplied with a rotor shipping brace, secure the rotor as per
● Protect the machine against strong radial vibrations, since the rotor shipping brace might
SIMOTICS DC 1GH6
Operating Instructions 02/2016
Fragile goods
the notes on transportation.
not absorb these completely.
Keep dry
Keep cool
Preparations for use
4.7 Transport and storage
Center of
Do not use
gravity
hand hook
Attach here
27

Advertisement

Table of Contents
loading

Table of Contents