Event Scheduling - Dukane 8950P User Manual

Hide thumbs Also See for 8950P:
Table of Contents

Advertisement

3. Management with Web browser software

3.4 Event Scheduling

The scheduling function enables to setup scheduled events including power on /
power off. It enables to be "self-management" projector.
NOTE
• You can schedule the following control events: Power ON/OFF, Input
Source and Transferred Image Display.
• The power on / off event has the lowest priority among the all events that are
defi ned at the same time.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specifi c date. (
• The priority for scheduled events is as follows 1) specifi c date 2) weekly 3)
daily.
• Up to fi ve specifi c dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., 'Specifi c date No. 1' has priority over 'Specifi c
date No. 2' and so on.
• Be sure to set the date and time before enabling scheduled events. (
36
21 )
23 )

Advertisement

Table of Contents
loading

This manual is also suitable for:

8951p8952p

Table of Contents