WIKORA WBL 150 Installation Manual Operating Instructions

WIKORA WBL 150 Installation Manual Operating Instructions

Dhw storage tank

Advertisement

Quick Links

Installation manual
Operating instructions
Index
1
General ............................................................................................................................................................................. 2
2
Transport and installation .................................................................................................................................................. 2
3
Dimensions and connections ............................................................................................................................................. 3
4
Technical data ................................................................................................................................................................... 4
5
Installation ......................................................................................................................................................................... 5
6
Commissioning .................................................................................................................................................................. 6
7
Maintenance and wear parts.............................................................................................................................................. 6
8
Recycling and disposal ...................................................................................................................................................... 6
9
Warranties and guarantee ................................................................................................................................................. 7
10
Installation record ............................................................................................................................................................. 8
© Wikora GmbH
DHW storage tank
WBL 150 - 200
Installation
and
undertaken by a specialist.
General terms and conditions of warranty state that
all installations must be carried out by a suitably
trained and qualified plumber who observes the
local norms and regulations.
The installation and maintenance record must be
entirely completed and the user has to be
instructed accordingly.
Efficient operation can only be guaranteed if the
instructions of this manual are followed.
Warranty does not cover any damage caused due
to non-observance of this manual and the technical
rules in force.
The system is to be checked annually by a
specialized company. In addition, occurring defects
must be repaired immediately.
This document should be handed over to the
client on completion of the installation.
.
Page 1
WIKORA GmbH
89568 Hermaringen
Phone: (07322) 9605-0
Fax: (07322) 9605-30
email: contact@wikora.de
commissioning
must
As of 8/26/2015
Errors excepted.
Friedrichstr. 9
be

Advertisement

Table of Contents
loading

Summary of Contents for WIKORA WBL 150

  • Page 1: Table Of Contents

    Phone: (07322) 9605-0 Fax: (07322) 9605-30 email: contact@wikora.de Installation manual DHW storage tank Operating instructions WBL 150 - 200 Installation commissioning must undertaken by a specialist. General terms and conditions of warranty state that all installations must be carried out by a suitably trained and qualified plumber who observes the local norms and regulations.
  • Page 2: General

    1 General Depending on the type and design, WIKORA tanks are suitable for heating and / or storing DHW and / or heating water. The heating is achieved indirectly via heat generators, if applicable, from different heat sources. The maximum working pressure and working temperature can be found in the technical data.
  • Page 3: Dimensions And Connections

    3 Dimensions and connections Illustration 1 Dimensions: Type [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] WBL 150 1010 WBL 200 1268 Chart 1 W = Tilting dimension Connections: Type WBL 150 WBL 200 Cold water / hot water ¾ ¾...
  • Page 4: Technical Data

    4 Technical data Description WBL 150 WBL 200 Storage volume (real) acc. to DIN EN 12897 [litre] Max. working temperature DHW / heating [°C] 95 / 130 95 / 130 Max. working pressure DHW / heating [bar] 10 / 16...
  • Page 5: Installation

    Max. heating performance NW 15 (1/2“) up to 200 l 75 kW NW 20 (3/4“) above 200 to 1000 l 150 kW Illustration 3 (Schematic drawing– example hydraulic system heating) © Wikora GmbH Page 5 As of 8/26/2015 Errors excepted.
  • Page 6: Commissioning

    It should be examined for the first time after 2 years and afterwards annually in order to check its transmission. The diameter should be at least 1/3 of the original diameter, the surface should be homogenous and without any limescale crust. If necessary, it should be replaced by an original Wikora anode to protect the tank against corrosion.
  • Page 7: Warranties And Guarantee

    Under condition that the limits of the valid DHW regulations have been respected, the anode has been examined for the first time after 2 years and afterwards annually and that the anode has been replaced by an original Wikora anode (individual receipts needed) by a specialized company.
  • Page 8: Installation Record

    In the case of reclamation, the receipts for maintenance must be provided as proof. Please complete the data sheet, including the reason for reclamation, and submit to Wikora. Submitting the maintenance record does not ensure any promise of guarantee or claim.

This manual is also suitable for:

Wbl 200

Table of Contents