Husqvarna TC 242T Operator's Manual page 7

Hide thumbs Also See for TC 242T:
Table of Contents

Advertisement

Available languages

Available languages

NOTE: You may now roll your tractor off the skid. Continue
using the instructions that follow to remove the tractor from
the skid.
WARNING: Before start ing, read, un der stand and fol-
low all in struc tions in the Op er a tion section of this man u al.
Ensure tractor is in a well-ventilated area. Ensure the area
in front of tractor is clear of other peo ple and objects.
TO ROLL TRACTOR OFF SKID (See Op er a tion
section for location and function of con trols)
Raise attachment lift lever to its highest po si tion.
Release parking brake by de press ing clutch/brake
ped al.
Place freewheel control in "TRANS MIS SION DIS EN-
GAGED" position. (See "TO TRANS PORT" in the
Op er a tion section of this manual.)
Roll tractor forward off skid.
Remove banding holding the deflector shield up against
tractor.
Continue with the instructions that follow.
CHECK TIRE PRESSURE
The tires on your tractor were overinflated at the factory
for shipping purposes. Correct tire pressure is important
for best cutting performance.
Reduce tire pressure to PSI shown on tires.
CHECK DECK LEVELNESS
For best cutting results, mower housing should be properly
leveled. See "TO LEVEL MOWER" in the Service and
Adjustments section of this manual.
CHECK FOR PROPER POSITION OF ALL
BELTS
See the figures that are shown for replacing motion and
mower blade drive belts in the Service and Adjustments sec-
tion of this manual. Verify that the belts are routed cor rect ly.
CHECK BRAKE SYSTEM
After you learn how to operate your tractor, check to see that
the brake is operating properly. See "TO CHECK BRAKE"
in the Service and Adjustments section of this manual.
ASSEMBLY
TO ASSEMBLE BAGGER (See Figs. 4 - 7)
Unfold bag and stand right side up.
Uninstall carriage bolts (5/16-18 x 1.5) and nuts (1)
from the front of the top frame.
1
With bagger assembly on its side, feed front bagger
frame ends (2) through fabric loops at each side of
bagger.
Reinstall carriage bolts and nuts (1) to connect front
frame to top frame, passing through bagger fabric (4).
Tighten securely.
CAUTION: Do not exceed 100 In-Lbs/11,2 Nm.
Snap front bagger frame bottom (3) into snap feature
(5) at front of bagger bottom.
1
Remove cross braces (6) from inside of bagger as-
sembly.
Slide cross brace (6) onto pin (7) at the rear of the up-
per bagger frame and secure with retainer spring clip
(8).
Slide cross brace (6) onto pin (9) at the front of the
bagger frame and secure with retainer spring clip (10).
Repeat on opposite side.
Remove clevis pin (11) and retainer spring (12) from
bagger handle (13).
7
Fig. 4
2
4
3
5
Fig. 5
3

Advertisement

Chapters

Table of Contents
loading

Table of Contents