Download Print this page

Field Operations-Ec Surveyor - Veris Quad 2800 Soil EC Mapping System Operating Instructions Manual

Advertisement

Attach the signal cable to the quick connect coupler at front of frame, and to Signal port on back of
EC Surveyor. Connect serial cable, GPS, and power cords to ports on rear of EC Surveyor.
Figures 1a and 1b
EC Surveyor display readings
Here are the display readings that you will see when operating the EC Surveyor:
Figure 2
The unit is ready to operate. The Surveyor is informing you of the firmware version its
programmable interface chip (PIC) contains. Immediately the screen will change to the operating
screen below:
GPS status: may
read GPS, DGPS,
RTK, or None. If
None, no GPS signal
is received and no
data will be sent out
serial port.
Field Operations—Soil EC Surveyor
Shallow (Sh) and Deep (Dp) soil EC
Ground speed
readings. If negative, no data will be
(from GPS) in
sent out serial port.
miles/hour
Note: The EC Surveyor display screens
are the same whether using Veris
DataLogger or laptop PC for recording.
Section 4
4-1
OM17-Quad2800
Figure 3

Advertisement

loading