Download Print this page

Harrod GFC-130 Assembly And Installation Instructions Manual

Heavy duty steel 2.5m decorative domed fruit cage

Advertisement

Quick Links

HEAVY DUTY STEEL
2.5M DECORATIVE DOMED FRUIT
CAGE
ASSEMBLY AND INSTALLATION INSTRUCTIONS
PRODUCT CODE: GFC-130/132
Revision 8
If you wish to concrete your cage in place please see page 8.
For more information on our cages please follow the below link:-
INS811

Advertisement

loading

Summary of Contents for Harrod GFC-130

  • Page 1 HEAVY DUTY STEEL 2.5M DECORATIVE DOMED FRUIT CAGE ASSEMBLY AND INSTALLATION INSTRUCTIONS PRODUCT CODE: GFC-130/132 Revision 8 If you wish to concrete your cage in place please see page 8. For more information on our cages please follow the below link:-...
  • Page 2: Part Identification

    PART IDENTIFICATION 11 10 PAGE 1...
  • Page 3 DOMED FRUIT CAGE ASSEMBLY INSTRUCTIONS Introduction Thank you very much for purchasing this Harrod Horticultural Decorative Domed Fruit Cage. Safety To install your cage safely we recommend that you enlist the help of three or more people. Take extra care when working on step ladders on soft ground.
  • Page 4 DOMED FRUIT CAGE ASSEMBLY INSTRUCTIONS 1: After reading the introduction & checking to make sure that all the required parts are accounted for within your pack. Lay out on the ground in the desired arrangement using all 2.5m horizontal support bars (Ref.13), all the connector plates (ref:18,19,20) and all three, four 7 five way connectors (ref : 14,15,16).
  • Page 5 DOME FRUIT CAGE ASSEMBLY INSTRUCTIONS 8: Once all of the marking out is complete, carefully dismantle the horizontal bar framework leaving connected only bars that can exist as a complete square unit (see step 13 for reference). Note that the threaded holes in the horizontal bars always face upwards. 9: Your site should be laid out in a similar way shown in (fig1).
  • Page 6: Important Note

    DOME FRUIT CAGE ASSEMBLY INSTRUCTIONS 16: Locate the first square unit into the 17: At all horizontal bar joins, bolt (ref:21,22) the tops of the uprights and the support upright. appropriate connector plate (ref:18,19,20) as in Locate any other complete square the example shown in (fig horizontal bar units in the same way fig 7...
  • Page 7 DOMED FRUIT CAGE ASSEMBLY INSTRUCTIONS 23: Bolt (ref 21,22) the curved roof 22: Slide the fitted roof net down over supports (ref 24) onto the connector the finial and align the seams with the plate (ref:18,19,20). Tighten the bolts curved bars. Using net ties (ref :26) using a 17mm spanner (fig 10).
  • Page 8 DOME FRUIT CAGE ASSEMBLY INSTRUCTIONS 31: Trim the net level with the top of the door. Any side net sticking up above the top edge of the 2.5m h o r i z o n t a l b a r s around the perimeter of the cage can also be trimmed.
  • Page 9 DOME FRUIT CAGE ASSEMBLY INSTRUCTIONS Concreting your Cage In most cases uprights will not require concreting in place. However if you require extra rigidity you may prefer to secure the uprights with concrete. Ground 0.15m x 0.15m holes can be dug to the 32.5cm required depth at the marked upright 0.15m...

This manual is also suitable for:

Gfc-132