Download Print this page

Honeywell Alerton ACM Installation Instructions Manual page 5

Ascent control module

Advertisement

Purpose: To meet FCC and CE standards for Class-B operation a clip-on ferrite is required on option card cables.
To install the clip-on ferrite:
1
Open the clip-on ferrite, loop the network cable through the ferrite no more than 3 inches from the connector, and then close
the ferrite around the cable.
2
For shielded cables, connect shield drain to Earth ground at one end only (not shown).
50096253-001 Rev.B
A d d e n d u m : A C M O p t i o n C a r d W i r i n g I n s t r u c t i o n s
PRINTED IN USA
Ascent Control Module
50096253-001
© Honeywell International Inc. All rights reserved

Advertisement

loading