Contents
Introduction ............................................................. 2
Installation ............................................................. 12
Maintenance .......................................................... 15
Spares................................................................... 18
Service Record ...................................................... 23
Warranty ................................................................ 24
The HWA Charter's Code of Practice requires that all members adhere to the following:
•
To supply fit for purpose products clearly and honestly described
•
To supply products that meet, or exceed appropriate standards and building and water regulations
•
To provide pre and post sales technical support
•
To provide clear and concise warranty details to customers
2
Introduction
The cylinder is a purpose designed unvented water
heater. The unit has a stainless steel inner vessel,
which ensures an excellent standard of corrosion
resistance. The outer casing is a combination of
resilient thermoplastic mouldings and plastic coated
corrosion proofed steel sheet. All products are insulated
with CFC free polyurethane foam to give good heat
loss performance. (see Table 2, page 7)
The unit is supplied complete with all the necessary
safety and control devices needed to allow connection
to the cold water mains. All these components are
preset and not adjustable.
This appliance complies with the requirements of the
CE marking directive and is Kiwa approved to show
compliance with Building Regulations (Section G3).
The following instructions are offered as a guide to
installation which must be carried out by a competent
plumbing and electrical installer in accordance with
Building Regulation G3, The Building Standards
(Scotland) Regulations 1990, or The Building
Regulations (Northern Ireland).
NOTE: Prior to installation the unit should be stored
in an upright position in an area free from excessive
damp or humidity.
IMPORTANT NOTE TO USER: PLEASE REFER TO
THE USER INSTRUCTIONS SECTION ON PAGE 20
FOR IMPORTANT INFORMATION WITH RESPECT TO
INSTALLATION AND COMMISSIONING CHECKLIST
AND SERVICING RECORD