Srne SR-EOC05B User Manual

Energy storage battery

Advertisement

Quick Links

SR-EOC05B Energy Storage Battery
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
User Manual
V1.0
T: +86 0755-26458295
F: +86 0755-27325578
File version: V1.0
E: master@szshuori.com
Page 1 of 36
W: www.srnesolar.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR-EOC05B and is the answer not in the manual?

Questions and answers

Summary of Contents for Srne SR-EOC05B

  • Page 1 File version: V1.0 SR-EOC05B Energy Storage Battery User Manual V1.0 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 1 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 2: Range Of Application

    Registered Jack 45 State Of Charge Charge C-rate RS485 RS485 Communication Interface Controller Area Network SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 2 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 3: Safety Precautions

    Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 4: General Safety

    DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 5: Personnel Safety

    ● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 6: Personnel Requirements

    Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 7: Grounding Requirements

    ● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 8: Product Introduction

    CAN/RS485/USB Lithium Battery Standard UN38.3,MSDS,IEC 62619: 2017,EN IEC 61000-6,UL1973 Storage time / temperature 6 months @25℃;3 months @35℃;1 months @45℃; SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 8 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 9: Model Coding

    B: Energy storage battery ③ Product category C: Power conversion module S: Energy storage system 3.3 Appearance Description SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 9 of 36 F: +86 0755-27325578...
  • Page 10: Application Scenarios

    BMS system, which can be easily expanded and can be combined into 45Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an on-grid or off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
  • Page 11: System Installation

    If any items are missing or damaged, please contact us. Picture Item Specification Quantity Battery Pack 51.2V,5.12kWh Mounting Frame Screw M8*60 expansion bolt SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 11 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 12 (Option) 120x35x2mm Rack mounting ear Rack mounting (Option) LS509 Handle Rack mounting (Option) Screw M6*8 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 12 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 13 Therefore, do not install it outdoors in areas with salt damage. The areas with salt damage are defined as the areas which are not 500m away from shore or will be affected by sea breezes. The areas affected by SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 14: Installation Space Requirements

    Wall mount: The battery should be placed in the right position first, and the installation site should be smooth and the wall should be solid, and the device is 200mm away from the ground,the distance between the batteries should be greater than 200-350mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 15 The battery should be at least 300cm away from the surrounding space. Rack mounting: Place the appropriate rack cabinet in the correct position. The battery should be at least 500cm away from the surrounding space.. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 16: Device Installation

    350*77mm back hook Mounting M8*60 expansion bolt Frame Screw Screw M6*8 Installation auxiliary 400*500mm board SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 16 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 17 Drill 6 holes according to the hole position, it is φ8 with depth of 45~50mm.Hammer the M8 screws to the above holes, and screw the nut. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 18 The battery pack is very heavy, which requires multiple people to install. CAUTION Keep the battery balanced, and then slowly hang the battery on the frame through the match hooks. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 19 Drill 2 holes according to the hole position, it is φ8 with depth of 45~50mm.Hammer the M8 screws to the above holes, and screw the nut. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 20 5.4.3.2 Install fixings The batteries that need to be stacked should be placed on a flat and sturdy floor.Install the stacking connectors between the batteries using corresponding screws. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 21 5.4.4.2 Install fixings Prepare a rack cabinet that matches the batteries and place the batteries in the cabinet. You can select SR-HT inverter and connect the corresponding cables. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 22: Electrical Connection

    6.2 Electrical Connection Of One Battery Module 6.2.1 Connecting Grounding Wire Each energy storage battery module shall be connected with the grounding wire provided with the product together. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 23: Connecting Power Cord

    6.2.3 Connecting Signal Line The signal line shall be used to connect RS485-Inverter interface for battery module and inverter. The communication port of the SRNE brand inverter needs to be connected to the RS485-2 interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 24 When connecting the inverter, the communication line must be connected and the communication protocol must be consistent. DANGER! The communication cable connected to the SRNE brand inverter is not a standard network cable. If you use a standard network cable, please cut off pins 1 and 2 for connection. NOTICE...
  • Page 25 If the load or inverter power is less than 5kw, you can choose to connect multiple batteries through parallel p ower cable . Parallel connection cable of battery modules are optional products. If necessary, please contact your local dealer. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 26 If there are multiple batteries, you need to connect the communication line of each battery.Battery and battery connection use RS485-Battery interface, battery and inverter connection need RS485/CAN-Inverter interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 27 Connect the inverter √ Master × Slave1 × Slave2 × Slave3 × Slave4 × Slave5 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 27 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 28: System Debugging

    Secondly, turn on the battery switch button and the battery starts to work.If there are multiple modules, please turn on the power switch one by one according to the address sequence. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 29: System Status Indication

    High temperature, Over Current Normal Blinking3 Alarm Blinking3 Blinking3 Discharging Over Discharge Protection Over Current,Short Current SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 29 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 30: Capacity Indicator

    Running status of ● Observe whether the energy storage appearance is Once every six months. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 30 of 36 F: +86 0755-27325578...
  • Page 31 Check whether the routing network is normal Check whether the router's 2.4G frequency band is turned on 8.4 Battery Storage and Maintenance 8.4.1 Battery Storage Requirements SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 32 13. Do not reverse polarity of the battery when storing or transporting the batteries, the batteries shall not be stacked up without protective packaging, and the number of stacked packed batteries should not exceed the number specified on the packaging. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 33: Device Cleaning

    9 Product Dimensions and Packaging 9.1 Product Dimensions The external dimensions of the energy storage battery module and power module are 580*446*120mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 34: Package Dimensions

    The energy storage battery module is packed in wooden cases with the size of 1149*1459*704mm, the number of packs is 10PCS, and the total weight is 600kg. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 35 80x44x36mm/Floor mounting Side fastener (Option) 120x53.5x38mm/Stacked mounting stacking contact (Option) 120x35x2mm/Rack mounting rack mounting ear (Option) SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 35 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 36 M6*8 Countersunk head GB 819-1976 Screw (Option) PM4*10 Pan head screw (Option) User Manual Standard SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 36 of 36 F: +86 0755-27325578 W: www.srnesolar.com...

Table of Contents