Chandler Equipment Company Personnel Bill Chandler Chief Executive Officer Advertising & Marketing Dealer / Distributor Arrangements Brannon Chandler Vice President / General Manager Production & Scheduling Warranty Jackson Chandler Vice President Operations Andrea Thompson Administrative Assistant Lisa Johnson Accounts Receivable Collections Michael Sosebee Sales Manager...
Page 9
Warranty Policy A) Standard Warranty: Chandler Equipment Company warrants that equipment manufactured by Chandler Equipment Company, under normal conditions of use and service, shall be free from material defects due to faulty manufacturing for the period listed below. a. Poultry Litter Spreaders and Conveyors – Six (6) Months b.
Page 10
c. Dealer shall be responsible for informing the customer of operating procedures, safety precautions and normal maintenance to help avoid any warranty issues. d. Promptly inform Chandler Equipment of any possible warranty issues. e. Dealer is responsible for making every effort to resolve warranty issues in a timely manner. f.
Page 11
J) Incomplete Equipment and Dealer Add-Ons: a. Chandler Equipment does not warrant any equipment sold INCOMPLETE. This includes (but is not limited to) axles, tires, any hydraulic components or paint. b. Any Non Genuine Chandler Parts that are installed as aftermarket add-ons by anyone not approved in writing by Chandler Equipment Company shall VOID ALL WARRANTIES.
SAFETY LABELS Your safety and the safety of those around you are very important to us here at Chandler Equipment Co. Therefore we have provided important safety labels throughout this manual. A safety label alerts you of potential hazards that can injure you or others. Each safety label is preceded by a safety alert symbol and either the words DANGER, WARNING, or CAUTION.
Safety Precautions 1) Be sure all guards or other safety devices, and decals are in place and functioning properly. 2) Stay away from moving parts when spreader is in operation. 3) Check lug nuts daily. 4) Maintain proper tire pressure, according tire manufacturers specifications.
Safety Decals WARNING! DO NOT ADJUST UNTIL SPINNERS STOP MOVING STAY OUT OF BOX WHILE CONVEYOR IS IN MOTION DO NOT RIDE ON SPREADER WHILE VEHICLE IS IN MOTION STAY CLEAR OF SPINNERS WHILE SPINNERS ARE IN MOTION THINK SAFETY! S - 3...
IMPORTANT The following section contains important information regarding the safety and operation of PTO drive equipment. As our spreaders are sold throughout the world we install a standard length PTO shaft to accommodate multiple types and brands of tractors. Therefore, modification (i.e. shortening) of the shaft may be required to meet the specific needs of your tractor.
Page 23
9) Attach the driveline to the tractor PTO and implement PIC. Make sure each end is firmly attached to its respective shaft. Make sure driveline does not bottom out when the implement is fully raised, and that at least 1/3 of the tube is engaged when the implement is at its lowest height.
Hydraulic Cylinder Engagement – Parts List Ref. Part Number Description 400-1-305 Hydraulic Cylinder – 2” x 4” 300-FT-046 Upper Cylinder Mount 300-FT-047 Upper Adjustable Cylinder Bracket 300-FT-045 Press Wheel Frame 300-1-117 Metal Press Wheel – 16” 800-1-108 16” X 6.5” X 8” Rubber tire ** Shown 2 - 8...
Page 39
PTF-71-2 RZ PTO Drive Spinner Gear Case Assembly and Parts List...
Page 40
PTF-71-2RZ – Spinner Gear Case Note: Bevel Gear # 17 goes on Input Shaft side for PTO Drive Spinner (PTF-71-2RZ) � Olllllll Po.ck this beo.ring with greo.se o. t o.sser,bly, 2 - 9...
Page 41
PTF-71-2RZ – PTO Drive Spinner Gear Case - Parts List Ref. Part Number Description Qty. PTF-1AZ Housing PTF-3 Gasket PTF-2A Cover PTF-4 Cap screw PTF-5 Lock Washer PTF-6 Shaft PTF-11 Oil Seal PTF-12 Retaining Ring PTF-10R Race Bearing PTF-10C Cone Bearing PTF-16 Thrust Washer PTF-13...
Page 42
PTF-71-2 RZ Gear Case Oil Level and Grease Point • Recommended 90W Gear Lubricant • Check Gear Lube before using. • Upper housing is factory greased but should Daily when in operation (2-3 pumps with manual grease gun) 90 Degree Grease Zerk Vent Oil Level Plug...
Hydraulic Cylinder Engagement – Parts List Ref. Part Number Description 400-1-305 Hydraulic Cylinder – 2” x 4” 300-FT-046 Upper Cylinder Mount 300-FT-047 Upper Cylinder Bracket 300-FT-045 Press Wheel Frame 300-1-117 Metal Press Wheel – 16” 800-1-108 16” X 6.5” X 8” Rubber tire ** Shown 3 - 7...
Page 51
PTF-71-2 RZ-FP Full Press Wheel Drive Spinner Gear Case Assembly and Parts List...
Page 52
PTF-71-2RZ-FP – Spinner Gear Case � '-------12 Po.ck this loeo.ring with greo.se o. t o.sseMloly, Note: Bevel Gear # 17 goes on the opposite side from Input Shaft for Full Press Wheel Drive Spinners (PTF-71-2RZ-FP) 3 - 8...
Page 53
PTF-71-2RZ-FP – Spinner Gear Case - Parts List Ref. Part Number Description Qty. PTF-1AZ Housing PTF-3 Gasket PTF-2A Cover PTF-4 Cap screw PTF-5 Lock Washer PTF-6 Shaft PTF-11 Oil Seal PTF-12 Retaining Ring PTF-10R Race Bearing PTF-10C Cone Bearing PTF-16 Thrust Washer PTF-13 Retaining Ring...
Page 54
PTF-71-2 RZ Gear Case Oil Level and Grease Point • Recommended 90W Gear Lubricant • Check Gear Lube before using. • Upper housing is factory greased but should Daily when in operation (2-3 pumps with manual grease gun) 90 Degree Grease Zerk Vent Oil Level Plug...
Page 55
Section 4 Press Wheel for Plug to Tractor Hydraulic Spinners...
PT-6 FSS Hydraulic Spinners – Plug to Tractor Pressure from Tractor Return to Tractor WARNING!!! Failure to hook up Hydraulic Spinner Option properly will Damage Tractor or Spreader Before hooking up hydraulic spinner option to tractor carefully read the operations and parts manual.
Hydraulic Spinners – Plug to Tractor Parts List Part # Description A) 400-1-313 Flow Control Valve with Built-in Relief Ball Valve – ½” 3000psi B) 400-1-323 C) 400-C-201 M - 30 2" Gear Spinner Motor D) 400-1-316 LT-50 Check Valve E) 400-1-316A HSP-1000-6-5 Check Valve 4 - 2...
Page 65
Hydraulic Spinners – Parts List Ref. Part Number Description 400-C-201 M-30 – 1.5" Gear Spinner Motor 300-1-210 Spinner Shaft - Carbon M30 300-1-211 Spinner Shaft - Stainless M30 300-FL-112 4 Bolt Spinner Hub - Carbon 300-FL-112A 4 Bolt Spinner Hub - Stainless 300-FL-101-L 24"...
Page 66
Spinner Motor M-30 – 2 Assembly Parts M-30 Motor Parts List Assembly Parts Description Description Part # 1A) GREASE SEAL M-30 - 2 Motor 400-C-201 1) SNAP RING M-30 Seal Kit (includes1A, 3, 10) 400-C-206 2) BEARING SPACER 1A) GREASE SEAL 400-C-215 3) MOTOR SHAFT SEAL 3) MOTOR SHAFT SEAL...
Page 69
Fertilizer and Lime Spreader Pressure Settings for Spinners 1) Checking Pressure A) Run unit empty at ordinary operating speed (engine RPM’s) for approximately 10 minutes. This allows oil to reach operating temperatures. B) Shut Tractor Hydraulics off and install pressure gauge into “CF” port on flow control valve.
Page 70
To avoid damage to Tractor or Chandler Spreader use following procedure when hooking up the hydraulic spinner option to the tractors hydraulic system. Hydraulic System Pumps: Today’s tractors are equipped with either Constant Displacement or Variable Displacement Hydraulic Pumps. Constant Displacement Pumps put out a constant flow regardless of pressure (until the relief valve bypasses the flow).
Hooking up Hydraulic Spinner Option to Tractor Remotes When hooking up Hydraulic Spinner Option use the following procedure. Connect Pressure Hose to tractor remote using coupler marked for the Lower Position. (Symbol indicates Lower Position) This will turn the spinners in proper direction when lever is in the Lower position. If tractor is equipped with hydraulic motor return option (low pressure return circuit) Connect Return Line here Connect Return Hose to tractor remote using coupler marked for the Raise Position.
Page 72
To check spinners for proper rotation use the following procedure. A) Start engine on tractor. B) Start spinners by pushing remote lever forward into the “Lower” position. Check to be sure spinners are turning the proper direction (see drawing page 5) C) If spinners are not turning proper direction switch hoses in remotes.
Setting Spinner Speed using Hydraulic Spinner Option Proper spinner speed for most common applications of Fertilizer and Lime is 650 RPM. The Flow Control Valve located on the side of the spreader controls this speed. Use the following procedure to set spinner speed: (After reading pervious pages and determining which hydraulic system you are using) A) After hooking up Pressure / Return lines and making sure they are turning in the proper direction.
Page 83
8 Bolt Hub Assembly Parts List Part # Description 800-3-101 60-8 - 8 Bolt Hubs Only 800-3-114 60-8 - 8 Bolt Wheel Stud 800-3-113 60-8 - 8 Bolt Wheel Nut 800-3-108 60-8 Hub Seal 800-3-104 60-8 Inner Bearing 800-3-105 60-8 Inner Race 800-3-107 60-8 Outer Race 800-3-106...
Page 84
Tire and Wheel Specs Air Pressure Tire and Bolt Pattern Tire Size Wheel Size (psi) Tire Part # Wheel Part # Wheel Part # 14L x 16.1 16.1 x 11 C 800-1-102 800-1-110 800-1-120 Lug Nut Torque Specifications (ft-lbs) Torque Stud Size Part Number (ft-lbs)
Basic Operation of a Pull Type Spreader 1) Make sure that flow control valve is adjusted properly for spinner speed. 2) Raise gate for desired rate of application. 3) Adjust material divider accordingly. 4) Engage Hydraulic Remote/PTO control, once engaged, spinners should begin turning.
Setting Spinner Speed – Hydraulic Spinners Only We recommend a spinner speed of 650–725 RPM as this unit is designed for a 50ft. spread pattern for fertilizer and a 30ft. pattern for lime. This spreader is equipped with a flow control valve to adjust spinner speed and to maintain a constant speed after your tractor reaches proper PTO RPM’s.
Page 89
Setting Material Divider Material Divider settings are very important to the accuracy of the spread pattern. Improper divider settings will cause light or heavy streaks in the field. Material Divider should be set following these guidelines: 1) Material Divider has an adjustment rod at the rear of the divider. Moving the divider “IN”...
Page 92
Extending the Life of Your Spreader through Proper Maintenance We at Chandler Equipment Co. are pleased that you have selected our equipment. We feel, as we are sure you do, with the high cost of fertilizers, repairs, and parts, that proper maintenance of equipment should be a high priority.
Page 93
D) Spinner Motors Check spinner motor seals daily for leaks. If spinner motor seal is leaking replace immediately. This could cause serious damage to hydraulic system and spinner motor. 8) Material Divider Maintenance A) It is necessary for the material divider and spinners to be clean at all times. B) Where excessive moisture exists it may be necessary to clean the material divider and spinners while in the field to achieve the best possible spread pattern.
Page 94
Troubleshooting Procedures The following investigation recommendations are given you to assist in simple repairs. To effectively troubleshoot these areas there are only two (2) special instruments that will probably not be found in a mechanic's tool box - these are - 0-1500 RPM hand tach and a 0-3000 PSI pressure gauge.
Page 95
C) Remove retaining ring from flow control valve. 1) With punch and hammer, knock lever spool from valve body. CAUTION - Be sure to mark in some manner top of spool before removing. 2) Clean thoroughly, area of housing from which lever spool was removed. 3) Clean thoroughly the lever spool outer area and blow out all holes with high pressure air hose.
Page 96
Problem II: Spinners will not throw material far enough. Recommended Investigation: A) Verify proper spinner speed. B) Check hydraulic pressure relief. (See Problem I – Investigation D) C) Check that spinner blade bolts are tight and properly in place. D) Check that the spinner discs are securely fastened. Problem III: Improper spread pattern.
Page 98
Spread Pattern Adjustment We at Chandler Equipment Co. recommend performing a spread pattern pan test prior to each spreading season, after any spreader maintenance or modification, and periodically throughout the spreading season. A spread pattern test must be performed for each product to be applied to insure proper material application.
Page 99
Spinner Assembly Spinner speed is adjustable as outlined above, and is a major factor in a proper spread pattern. The best spinner speed will depend on the material being spread, and only obtainable by way of testing. Material properties play an important role in properly adjusting the spinner speed for the maximum spread pattern width.
Page 100
Spreader Preparation The spreader to be tested should be properly maintained and in good mechanical working condition in accordance with this manual. All damaged or worn parts should be replaced prior to completing the spread pattern test. Spinner discs, blades, and material divider should be free of any material build-up or rust.
Page 103
Data Recording Using the data sheets supplied, document any and all adjustments made to the spreader while conducting the pan test. Using the funnel, transfer the contents of each catch pan into the corresponding test tube for its position. NOTE: It is highly recommended to only make ONE adjustment between each test. If more than one adjustment is made it will hard to determine which adjustment is responsible for the change in spread pattern shape.
Page 104
Acceptable Pattern Using a 3 Pass Switchback Driving Method 10 - 7...
Page 105
Spread Pattern Troubleshooting Problem Recommended Adjustments Heavy Directly Behind the Tractor 1) Move the material divider towards the back of the spreader. 2) Decrease spinner speed. 3) Check spinner blade condition. Light Directly Behind the Tractor 1) Move the material divider towards the front of the spreader. 2) Increase spinner speed.