NEC NEAX 7400 ICS Installation Manual page 77

Table of Contents

Advertisement

NAP- 200-006
Sheet 3/3
Cable Running to MDF
(3)
For connection to an existing MDF, bring the MDF cables into the Main Equipment through the cable hole(s)
of the BASE as shown in Figure 006-2.
(4)
Plug the CHAMP connector of each cable to its LTC connector located on the PIM, and screw them together.
PABX
PIM1
PIM0
BASE
TO MDF
FRONT
Figure 006-2: Example of Existing MDF Cable Running
LTC CONNECTOR
AD-25182501
CHAMP CONNECTOR
CHAPTER 3
Page 63
Revision 1.0.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

120

Table of Contents