Precautions
Instal the drain raising pipes at a height of less than 310 mm.
Install the drain raising pipes at a right angle to the indoor unit
and no more than 300 mm from the unit.
NOTE
The incline of attached drain hose should be
75 mm or less so that the drain socket does not
have to stand additional force.
To ensure a downward slope of 1:100, install
hanging bars every 1 to 1.5 m.
If unifying multiple drain pipes, install the pipes as
shown in
figure
whose gauge is suitable for the operating capacity
of the unit.
1
T-joint converging drain pipes
2.
After piping work is finished, check if drainage flows smoothly.
Open the water inlet lid, add approximately 2 l of water gradually
and check the drainage flow.
Method of adding water. See
1
Portable pump
2
Water inlet lid
3
Close
4
Open
5
Bucket
6
Refrigerant piping
7
Water inlet
If adding water from the charge inlet at the fan casing, be sure to put
the lid back in its original position.
When electric wiring work is finished
Check drainage flow during COOL running, explained in chapter
"TEST OPERATION".
When electric wiring work is not finished
Remove the switch box lid and connect the power supply and
remote controller to the terminals.
See
figure
11.
1
Clamps A and B details
2
Clip
3
Terminal board
4
220 V-240 V single phase power supply
5
Electric parts box
6
Terminal board for transmission wiring
7
Clamp B
8
Transmission wiring
9
Guide plate
10
Power supply wiring
11
Clamp A
12
Terminal board for power supply
13
Electric parts box lid
Next, press the inspection/test operation button
remote controller. The unit will engage the test operation mode.
Press the operation mode selector button
fan operation
. Then, press the on/off button
unit fan and drain pump will start up. Check that the water has
drained from the unit. Press
Installation and operation manual
4
9. Select converging drain pipes
figure
10.
TEST
until selecting
. The indoor
to go back to the first mode.
TEST
You can check whether drainage is satisfactory or not by
removing the access opening lid and checking the water level of
the drain pan through the access opening. Be careful when
doing so because the fan is turning at the same time. See
figure
12.
1
Access opening
2
Access opening lid
3
Close
4
Open

Electric wiring work

General instructions
All field supplied parts and materials and electric works must
conform to local codes.
Use copper wire only.
Follow the "Wiring diagram" attached to the unit body to wire the
outdoor unit, indoor units and the remote controller. For details
on hooking up the remote controller, refer to the "Installation
manual of the remote controller".
All wiring must be performed by an authorized electrician.
A circuit breaker capable of shutting down power supply to the
entire system must be installed.
This system consists of multiple indoor units. Mark each indoor
unit as unit A, unit B..., and be sure the terminal board wiring to
the outdoor unit and BS unit are properly matched. If wiring and
piping between the outdoor unit and an indoor unit are
mismatched, the system may cause a malfunction.
Electrical characteristics
Model
FXCQ20~125
Model
FXCQ20
FXCQ25•32
FXCQ40•50
FXCQ63
FXCQ80
FXCQ125
MCA: Min. circuit Amps (A)
MFA: Max. Fuse Amps (A)
KW: Fan Motor Rated Output (kW)
FLA: Full Load Amps (A)
NOTE
For details, refer to "Electrical data".
Specifications for field supplied fuses and wire
Model
FXCQ20~125
on the
Model
FXCQ20~125
Hz
Volts
Voltage range
50
230
min.198-max.264
power supply
Fan motor
MCA
MFA
KW
0.5
16 A
0.010
0.5
16 A
0.015
0.8
16 A
0.020
0.9
16 A
0.030
1.1
16 A
0.050
1.3
16 A
0.085
Power supply wiring
Field fuses
Wire
16 A
H05VV-U3G
Transmission wiring
Wire
Sheathed wire (2)
0.75-1.25mm
FXCQ20~125M7V1B
VRV System air conditioners
FLA
0.4
0.4
0.6
0.7
0.9
1.0
Size
Local codes
Size
2
4PW15108-1

Advertisement

Table of Contents
loading

Table of Contents