6.
OPERATION AND FUNCTION
7.
OPERATION CHECK
(1) After wiring, set the LED to the on mode and check the operation. It takes aprox. 1 minute for warm up after
turning the power on.
(2) Confirm the detection zone by walk testing the unit.
(3) Check the operation of the connected equipment.
(4) If necessary, make fine adjustments.
- 4 -