Download Print this page

GE 15164 Quick Start Manual page 6

Advertisement

Step 3: Complete the circuit to the load
1. Connect 240VAC Line 1
(Black) of Load to
Terminal L.
2. Connect 240VAC Line 2
(Black) of Load to
Terminal 1.
3. Connect the bare wire
to the ground lug.
Tighten the screw
terminals to 25in-lb.
Improper tightening can
cause heating and
equipment failure.
Step 4: Reinstall the Plastic Guard
Install both screws with the plastic
guard facing the original position.

Advertisement

loading