Inspection And Transport; Transport Of Terra Gateway Pro To The Site; Inspect The Terra Gateway Pro On Delivery - ABB Terra Gateway Pro Installation Manual

Table of Contents

Advertisement

5 Inspection and transport

5.1 Transport of Terra Gateway Pro to the site

A shipping company delivers the TGP to the site. The movement of the TGP to its final installation
location is the installer responsibility.
If the TGP needs to be stored before installation, obey the ambient conditions for storage. Refer to
section 8.7.

5.2 Inspect the Terra Gateway Pro on delivery

Procedure
1.
Unpack the TGP.
2.
Do a check if the TGP is in accordance with the order.
3.
Do a check on the TGP for damage and liquid ingress into the packaging material.
4. Validate the factory seal of the battery tray is not violated.
5.
If the TGP shows damage or is not in accordance with the order, contact the transport
company immediately.
STATUS
Released
© Copyright 2022 ABB. All rights reserved.
Warranty
Warranty will be considered void when the battery tray seal of the Terra Gateway
Pro is damaged or removed.
SECURITY LEVEL
Public
I NSTA LLAT IO N MA NUAL
CAUTION
REV.
001
LANG.
PAGE
en
23/31

Advertisement

Table of Contents
loading

Table of Contents