nystrom EJ-FLF140 Installation, Operation And Maintenance Manual

Seismic fire barrier expansion joint system

Advertisement

Seismic Fire Barrier Expansion Joint System
Model(s): EJ-FLF140/EJ-FLW140

GENERAL DESCRIPTION

GENERAL SAFETY PRECAUTIONS Improper selection, installation, or use can cause personal injury or property damage.
It is solely the responsibility of the user, through its own analysis to select products suitable for their specific
application requirements, ensure they are properly maintained, and limit their use to its intended purpose. Follow
proper local, state and federal regulations for proper installation and operation requirements.

Preparation

Please read the complete instructions carefully before beginning any work. To ensure proper
installation and performance of the expansion joint system the following actions must be
completed by the installing contractor. Failure to do so will affect product warranty.
o Inspect all shipments and materials for missing or damaged components and hardware.
o Verify joint width in field prior to ordering system. Minimum joint width of 2 inches
(51mm).
o Verify the structural gap and blockout dimensions are in conformance with submittal data
before beginning installation. Certification of this product was completed by Intertek
Testing laboratories. Product must be installed in accordance with these Installation
Instructions.
o Ensure joint is plumb and square, also verify soundness of substrate. Repair any spalls or
cracks prior to proceeding.
o For vertical (wall) conditions, single-sided and double-sided blankets are available. For
single-sided product, ensure drape of blanket faces "potential" threat" side of wall.
Expansion Joint Systems are an important life safety requirement
in current building codes. These systems allow safe movement
when buildings shift due to expansion and contraction.
The following are general instructions for installing, operating and
maintaining Expansion Joint Systems.
Installation, Operation
©2020 Nystrom, Inc.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EJ-FLF140 and is the answer not in the manual?

Questions and answers

Summary of Contents for nystrom EJ-FLF140

  • Page 1 Installation, Operation + Maintenance Manual Seismic Fire Barrier Expansion Joint System Model(s): EJ-FLF140/EJ-FLW140 GENERAL DESCRIPTION Expansion Joint Systems are an important life safety requirement in current building codes. These systems allow safe movement when buildings shift due to expansion and contraction.
  • Page 2 Seismic Fire Barrier Expansion Joint System Installation, Operation & Maintenance Model(s): EJ-FLF140/EJ-FLW140 o If job site specific conditions exist, these general installation instructions do not take place of an Engineering Evaluation if required. Any modifications made to the product without documented manufacturing direction will void the warranty.
  • Page 3 Seismic Fire Barrier Expansion Joint System Installation, Operation & Maintenance Model(s): EJ-FLF140/EJ-FLW140 6. Cut the zip-ties for the current fire barrier and continue installation for the rest of the run, figure 4. 7. If field conditions require a stick to be cut short, measure the required length from male end and cut the appropriate length, figure 5.
  • Page 4 Seismic Fire Barrier Expansion Joint System Installation, Operation & Maintenance Model(s): EJ-FLF140/EJ-FLW140 Figure 7 Figure 8 16. Install continuous run before installing intersecting run, figure 9. 17. Before installing the intersection. Cut the intersecting end of the assembly to achieve a clean butt end, figure 9.
  • Page 5 Expansion Joints are designed and built for years of dependable service. MAINTENANCE o Annual inspections should be performed to make sure the system is still in position. Repair and/or replace as needed. QUESTIONS? For more information on installation, repair or replacement, please visit www.Nystrom.com. ©2020 Nystrom, Inc. REV 8/2020...

This manual is also suitable for:

Ej-flw140

Table of Contents