Download Print this page

Electrical Outlet; Drawer Installation; Grounding Instructions - Sharp SMD2499FSC Installation Manual

Convection microwave drawer

Advertisement

ELECTRICAL OUTLET

The electrical requirements are a 120 volt 60 Hz, AC only, 20 amp.
or more protected electrical supply. It is recommended that a
separate circuit serving only this appliance be provided.
The drawer is equipped with a 3-prong grounding plug. It must
be plugged into a wall receptacle that is properly installed and
grounded. Should you only have a 2-prong outlet, have a qualified
electrician install a correct wall receptacle.
Note: If you have any questions about the grounding or electrical
instructions, consult a qualified electrician or serviceperson.
* Can also be installed using an electrical outlet in an adjacent cabinet
within the area where the provided electrical cord can reach.
Always check electrical codes for requirements.
Emplacement
suggéré de la prise
électrique*

GROUNDING INSTRUCTIONS

This appliance must be grounded. The Convection Microwave
Drawer is equipped with a cord having a grounding wire with a
grounding plug. It must be plugged into a wall receptacle that is
properly installed and grounded in accordance with the National
Electrical Code and local codes and ordinances. In the event of
an electrical short circuit, grounding reduces risk of electric shock
by providing an escape wire for the electric current.
– Improper use of the grounding plug can result
in a risk of electric shock. Do not use an extension cord. If the
power supply cord is too short, have a qualified electrician or
serviceperson install an outlet near the appliance.
127 mm (5 po)
101,60 mm
(4 po)
Figure 8

DRAWER INSTALLATION

1. Place the Convection Microwave Drawer adjacent to the
wall or cabinet opening. Plug the power supply cord into the
electrical outlet.
2. Carefully guide the Convection Microwave Drawer into the
prepared opening. Avoid pinching the cord between the oven
and the wall.
3. Slide the Convection Microwave Drawer all the way until
the mounting flange is flush with the face of the cabinet. See
Figure 9.
4. Open the drawer. Using the 4 holes on the drawer as a template,
pre-drill the cabinet using a
5. Secure the drawer with the 4 screws supplied. See Figure 10.
Parts supplied - 4 Screws
5
/
" bit. See Figure 9.
1
16
Side
Rail
Figure 9
Figure 10
E
E

Advertisement

loading