Download Print this page

Installation - Cooper Lighting Solutions Invue VWM Vision Wall Medium Installation Instructions Manual

Advertisement

Available languages

Available languages

Installation Instructions - VWM Vision Wall Medium

INSTALLATION

Tools Required
3/16" Hex Allen Key, Philip's screw driver, 1/2" socket
wrench.
Installation
The Vision Wall luminaire has two different types of
mounting interface:
1.
Standard Mount—mounts to any standard 4" junction
box (Included with every fixture) (Figure 1).
2.
Embedded Mount—mounts to a plate embedded into
the wall (Optional accessory VWM/EM) (Figure 2).
Please refer to your mounting kit for specific
N
ote:
instructions.
3.
You may install the fixture with the light up or down,
based upon catalog configuration ordered (uplight
and downlight are two separate configurations with
different fixture housings).
N
ote:
Make sure all power is off.
4.
Visually inspect the mounting bracket to insure correct
placement and check for damaged gaskets. (Refer to
the specific mounting instructions for your fixture).
5.
Loosen the four 1/4-20 captive socket head cap screws
and open the door. (Figure 7 .)
6.
Unscrew the #10-24 locking screw to disengage and
pivot the LED assembly out of the way. (Figure 8. and
Figure 9.)
7 .
Thread the incoming power leads through the large
center hole in the rear of the fixture while lining up the
bolts (or threaded studs) with the keyhole slots in the
rear. (Figure 10.)
4" J-Box (By Others)
Figure 1. Standard Mount
2
COOPER LIGHTING SOLUTIONS
Standard Mount Kit Screws to J-Box
IB514020EN
Installation instructions
Figure 2. Embedded Mount VWM/EM
Thru Way Mounting
Conduit Run by
Others
Figure 3. Thru-Way Box VWM/TB
12 9/16"
[319.2mm]
Figure 4.
Embedded Mount Kit
[118.4mm]
9 3/16"
[233.1mm]
4 11/16"

Advertisement

loading