Hand Chain For Geared Tg Model - Tiger TP Original Instruction Manual

Trolley
Table of Contents

Advertisement

For TG geared trolley models
TG geared trolley models are supplied with a hand chain operated gear. Inspection of the hand chain must be included in any
inspection of the TG trolley. If the unit's hand chain has been supplied with a Tiger Hand Chain Joiner link, make sure that it
has been fitted correctly and is in good working order. See Chapter 4 – Hand Chain for Geared TG Model for more information.
Thorough Examination
This trolley must be subject to periodic thorough examination in compliance with national statutory regulations
Reports of thorough examination can be based on statutory maximum intervals or via a written examination scheme based on
risks and hazards associated with use.
An Inspection Log is included in Chapter 11 for making a dated record of any required inspections.
Maintenance
Maintenance of the trolley should include the following:
Clean the trolley.
Lubricate any moving parts including the pinion gear and wheel teeth for geared trolleys.
Keep the running surface of wheels and contact surface of the track free of any contamination including lubricants.
Correctly secure all fastenings.

4. Hand Chain for Geared TG Model

Tiger hand chain is 5mm × 24mm and either galvanised hand chain or corrosion protected hand chain.
Only fit hand chains which have been approved by the manufacturer.
If the unit's hand chain has been supplied or subsequently fitted with a Tiger hand chain joiner link (HC-050-JL)
make sure that it has been fitted correctly and is in good working order.
Make sure that the HC-050-JL has been fitted in the correct orientation as shown in figure 1 below.
Figure 1
Regularly inspect the HC-050-JL. In the event of any defects remove from service and refer the hoist to a competent
person for thorough examination
Hand Chain Maintenance
Hand Chain should be cleaned, inspected and checked for damage. Hand chain, used on geared trolleys, does not
normally require lubrication.
Unit 1, Greensfield Industrial Estate,
Willowburn Avenue,
ALNWICK, NE66 2DG
Figure 2
Instruction Guide Tiger TP-TG En 201812 v1.1
www.tigerlifting.com
Page 6 of 14

Advertisement

Table of Contents
loading

Table of Contents