5.3.2 Main Electrical Panel

Route "AC Grid" L1, L2, Neutral, and Ground to a dedicated 2-
pole 100 back-feed rated disconnect that is line-tapped to the
main electrical panel.
GND
PV inverter: string
or combined micro
Figure 14: Core Hub AC port connections.
5.3.3
Refer to the above diagram for the wiring connections in the following sections. Neutral and ground
connections for the sections below are terminated at the common neutral and ground bus respectively.
PV
Load
L1 L2
|----N----|
L1 L2
5
N
GND
Backup panel
5.3.4
Figure 13: Main panel connection.
PCS
L1 L2
8
7
L1 L2
N
GND
PE
N
L
LE
LE
NE
5.3.5
12