Page 1
ET114E-N 技术参 数 70KG 25mm/s Assemble (1)&(2)(3) together, use the 5x5 allen key (C) to tighten the screws(A). 100-240V 710mm 1210mm Install Supporting beam(4) 1000-1600mm 500-800mm 10%(Pause 18 minutes for each continuous 2-minute operation) 0~40°C Loose Stretch Install supporting beam(4) on the columns(2)(3), tighten the screw (B) with the 5x5 allen key (C).
Page 2
STEP6-2 Install baffle and power adaptor Insert 2.5x2.5 Install the baffle (8) to the supporting beam (4) using screws (E), and then tighten it with the 2.5*2.5 allen key (D). Connect supporting plate(6) with columns(2)(3). use the 5x5 allen key(C) to tighten the screws(A). STEP7 Connect all cables to the adaptor (7) Install the tabletop, control box...
Page 3
Attention Common fault treatment The following tips will help you detected and eliminate the common 1. Power supply: AC100V-240V,50/60Hz fault and error. If the error you meet is not on the list, please contact 2. Service Environment: 0-40℃ our customer service. 3.
Need help?
Do you have a question about the ET114E-N and is the answer not in the manual?
Questions and answers