Chapter 5: Installing Equipment in the Cabinet
Adjusting the vertical mounting rails on the side braces
WARNING: To avoid personal injury or damage to the enclosure, perform this
procedure without any equipment installed on the mounting rails.
1. Use a 10-mm socket (not included) to loosen—but not remove—the bolts in
the vertical mounting rails. See Figure 5-2.
Front
7
vertical rail
2. Move the vertical mounting rail to the desired location and tighten the bolts.
7
Page 20
6
Adjustment
Figure 5-2. Loosen the bolts on the rails.