Preparing The Cabinet For Installation; Handling; Tools You Will Need; Adjusting The Doors - Black Box Touchboards QuietCab QC12UBE User Manual

12u, 24u, and 42u soundproof data cabinets
Table of Contents

Advertisement

Chapter 3: Preparing the Cabinet for Installation

3. Preparing the Cabinet for Installation

Follow these simple recommendations for best performance from your new
enclosure.

3.1 Handling

NOTE: For palletized cabinets, see the unpacking instruction sheet before
attempting to remove the cabinet from the pallet.
To achieve the level of acoustic performance and industrial needs of a high-quality
19" enclosure, the composition of cabinet parts means that the QuietCab
cabinets are very heavy. When moving the cabinet, we recommend that a
minimum of two people carry out this task.

3.2 Tools You Will Need

• 10-mm ratchet and socket
• Phillips screwdriver
• Utility knife
• Level
• Cage nut tool

3.3 Adjusting the Doors

The QuietCab cabinet's doors are aligned before they leave the factory. But in
case they need adjustment, follow these instructions.
Side-to-side adjustment
Turning the front screw on the hinge counterclockwise will move the door closer
to the corresponding side panel. Turning the screw clockwise will move the door
toward the opposite side panel.
Front-to-back adjustment
Loosening the back screw will allow the hinge to be adjusted frontward or
backward. Tighten the screw after adjustment.
Page 16
724-746-5500 | blackbox.com

Advertisement

Table of Contents
loading

Related Products for Black Box Touchboards QuietCab QC12UBE

Table of Contents