5. Installing Equipment in the Cabinet

5.1 Leveling the Cabinet

Level the enclosure before installing equipment. The leveling feet at the corners
provide a stable base if the floor is uneven, but they cannot compensate for a
badly sloped surface.
1. Move the enclosure to a level location.
2. For each leveling foot, turn the leveling foot clockwise until it makes firm
contact with the floor.

5.2 Adjusting the Vertical Mounting Rails

Vertical mounting rails are factory installed on the enclosure (see Figure 5-1) in the
proper position to use with rackmountable equipment. The front mounting rails
are adjustable towards the front or the rear of the enclosure to accommodate
different rails or equipment with other depths. You can adjust the rails to be as
close as 22.5" (57.2 cm) or as far as 30.25" (76.8 cm) apart.
Adjustable front
7
vertical rails
Figure 5-1. Vertical mounting rails installed in the cabinet.
8
7
Chapter 5: Installing Equipment in the Cabinet
Fixed rear
6
vertical rails
6
724-746-5500 | blackbox.com
5
4
4
5
2
3
3
2
Page 19
1
1